PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing copper piping at the 1st floor Facing South.jpg Patching the shear walls Stair -2-Elev. 4 (South Elevation).jpg Copper piping at the 3rd floor bathroom Facing North.jpg Installed metal furring at 2nd floor Elev. 5,6 Shear wall Facing North-East.jpg Installed sheathing around the perimeter of the low roof Facing North-West.jpg Installing copper piping at the 2nd floor bathrooms.jpg Installing copper piping at the 3rd floor bathrooms Facing West.jpg Laying out block at Break Room 131 Facing North-West.jpg Setting the door frame at the Sally port Entrance (West Elevation).jpg
Previous pageNext page Installed sheathing around the perimeter of the low roof Facing North-West
Installed sheathing around the perimeter of the low roof Facing North-West